IND vs BAN 2d Check: The toss on the India vs Bangladesh 2d Check in Inexperienced Park Stadium, Kanpur has been behind schedule. With in a single day rain within the town, the outfield of the venue remains to be rainy which has brought about the lengthen within the toss and due to this fact the beginning of the day’s play.
Rain is anticipated at the first 3 days of the 2d Check tournament. Floor inspection is scheduled at 09:30 am (Indian Usual Time) and then an respectable announcement on when the toss would occur and play would begin will probably be made. India are 1-0 up within the two-match Check sequence, having gained the Check sequence opener on the MA Chidambaram Stadium in Chennai.
📍 Kanpur
Able for the 2d Check 💪 #TeamIndia | #INDvBAN | @IDFCFIRSTBank percent.twitter.com/OfTYl5NAA6
— BCCI (@BCCI) September 27, 2024
Recreation face 🔛
All eyes at the 2d #INDvBAN Check in Kanpur 🙌#TeamIndia | @IDFCFIRSTBank percent.twitter.com/XB45pSgfvP
— BCCI (@BCCI) September 26, 2024
Shakib Al Hasan Confirms Retirement On Eve Of Kanpur Check
A lot of the chatter forward of the IND vs BAN 2d Check used to be round Shakib Al Hasan who stated that the Kanpur Check might be his final.
“I’ve expressed my need to play my final Check in Mirpur, if that may not occur, 2d Check in opposition to India could be my final,” Shakib stated.
READ HERE | Kanpur Climate Nowadays: Will Rain Play Spoilsport On Day 1 Of India vs Bangladesh 2d Check?
“Bangladesh cricket has given me such a lot, and I wish to give my final on this structure at house,” he added.
In the meantime, the famous person Bangladesh all-rounder showed that he has already his final T20I. Having made his Check debut in India in 2007, lifestyles may come a complete circle for the southpaw, a vetran of over 440 world fits if the Kanpur Check seems to be the final certainly one of his illustrious profession.